Copyright © 2011 Penro Construction. All Rights Reserved.
Setting the base section of the Main Lift Station, Winnebago, NE
Pouring the base for a box culvert in Pender, NE to add text.
Setting a manufactured wastewater treatment facility at Logan View High School near Winslow, NEk here to add text.
Water main leading to the Kelly Property Water Tower, Winnebago, NEck here to add text.
Undercrossing a 30" natural gas main with three parallel 18" sanitary sewer mains in South Sioux City, NE
Installation of HDPE liner in wastewater lagoons in Verdigre, NE
Installation of 20" water main in Fremont, NE.
Pouring base for a lift station in Fremont, NE.